Co-Create

26-1050 · Q-2026-1050

Maxcon Industries — Structural steel package — process building
Demo 05 Oct 2026
Job no
26-1050
Quote
Q-2026-1050
Client
Maxcon Industries
Estimator
Matthew Warren
Quote date
19 Aug 2026
Valid to
18 Sep 2026
Status
Lost
Enquiry
Direct to quote
Item schedule One sheet per item — open a sheet to cost it, then mark each item won, lost or pending
2 / 25 items
ItemDescription MaterialsLabourContract Hrs F / S / O SellContributionGP% Outcome
1 Primary structural steel — columns & rafters $51,360 $73,244 $18,609 626 / 405 / 138 $204,973 $135,004 30.1%
Open sheet →
2 Secondary steel, purlins & bracing $16,299 $23,650 $5,913 199 / 129 / 46 $65,622 $43,410 30.1%
Open sheet →
Quote total · ex GST $67,659 $96,894 $24,522 825 / 534 / 184 $270,595 $178,414 30.1%
Each new item opens on its own sheet with a starter costing you can adjust.
Quote summary
Sell (ex GST)
$270,595.35
GST
$27,059.54
Total (inc GST)
$297,654.89
Materials$67,659.00
Labour$96,894.00
Contract services$24,522.00
Gross profit$81,520.35 30.1%
Contribution$178,414.35 65.9%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
825Factory
534Site
184Office
Won / lost position
Won$0.00
Lost$270,595.35
Pending$0.00
SharePoint folder
Created automatically
Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1050 Maxcon Industries — Structural steel package — process building
  • 01 Enquiry & Tender
  • 02 Quote Book 2 item sheets
  • 03 Drawings (SolidWorks)
  • 04 Purchasing
  • 05 QA & ITPs
  • 06 Safety & SWMS
  • 07 Progress Claims
Client
Maxcon Industries
Paul Rundle · paul@maxconindustri.com.au
Kilburn SA · ABN 84 914 311 657
0413 774 903
Open customer →
Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.