Job no
26-1050
Quote
Q-2026-1050
Client
Maxcon Industries
Estimator
Matthew Warren
Quote date
19 Aug 2026
Valid to
18 Sep 2026
Status
Lost
Enquiry
Direct to quote
Quote summary
Sell (ex GST)
$270,595.35
GST
$27,059.54
Total (inc GST)
$297,654.89
Materials$67,659.00
Labour$96,894.00
Contract services$24,522.00
Gross profit$81,520.35 30.1%
Contribution$178,414.35 65.9%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
825Factory
534Site
184Office
Won / lost position
Won$0.00
Lost$270,595.35
Pending$0.00
SharePoint folder
Created automatically Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1050 Maxcon Industries — Structural steel package — process building
- 01 Enquiry & Tender
- 02 Quote Book 2 item sheets
- 03 Drawings (SolidWorks)
- 04 Purchasing
- 05 QA & ITPs
- 06 Safety & SWMS
- 07 Progress Claims
Client
Maxcon Industries
Paul Rundle · paul@maxconindustri.com.au
Kilburn SA · ABN 84 914 311 657
0413 774 903
Open customer → Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.
Co-Create Solutions
37 Ellemsea Circuit · Lonsdale SA 5160
ABN 62 137 984 210 · (08) 7231 0699 · cocreate.net.au
QUOTE
Q-2026-1050 · Job 26-1050
Date 19 Aug 2026
Valid until 18 Sep 2026
Bill to
Maxcon Industries
Paul Rundle
Kilburn SA
ABN 84 914 311 657
| Description | Qty | Unit (ex) | Amount (ex) |
|---|---|---|---|
| Item 1 — Primary structural steel — columns & rafters | 1 | $204,973.35 | $204,973.35 |
| Item 2 — Secondary steel, purlins & bracing | 1 | $65,622.00 | $65,622.00 |
| Subtotal (ex GST) | $270,595.35 |
| GST 10% | $27,059.54 |
| Total (inc GST) | $297,654.89 |
Prices exclude GST unless stated. Each item may be accepted individually. Lead times confirmed on award. Fabricated to AS/NZS 5131 & AS/NZS 1554.
Co-Create Solutions · Engineering & fabrication partner