Co-Create

26-1058 · Q-2026-1058

SAGE Automation — Structural steel & stair — warehouse extension
Demo 05 Oct 2026
View project PRJ-2026-410 →
Job no
26-1058
Quote
Q-2026-1058
Client
SAGE Automation
Estimator
Tanya Fielke
Quote date
17 Sep 2026
Valid to
17 Oct 2026
Status
Won
Enquiry
Direct to quote
This quote is won. Item outcomes are recorded and the quote book is locked — won items are now on project PRJ-2026-410.
Item schedule Outcome recorded for each item
2 / 25 items
ItemDescription MaterialsLabourContract Hrs F / S / O SellContributionGP% Outcome
1 Handrails — structural steel & stair $7,320 $10,890 $2,691 89 / 58 / 23 $29,886 $19,875 30.1% Won Open sheet →
2 Access platform — structural steel & stair $7,320 $11,250 $2,652 89 / 58 / 23 $30,273 $20,301 29.9% Won Open sheet →
Quote total · ex GST $14,640 $22,140 $5,343 178 / 116 / 46 $60,158 $40,175 30%
Quote summary
Sell (ex GST)
$60,158.25
GST
$6,015.83
Total (inc GST)
$66,174.08
Materials$14,640.00
Labour$22,140.00
Contract services$5,343.00
Gross profit$18,035.25 30%
Contribution$40,175.25 66.8%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
178Factory
116Site
46Office
Won / lost position
Won$60,158.25
Lost$0.00
Pending$0.00
SharePoint folder
Created automatically
Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1058 SAGE Automation — Structural steel & stair — warehouse extension
  • 01 Enquiry & Tender
  • 02 Quote Book 2 item sheets
  • 03 Drawings (SolidWorks)
  • 04 Purchasing
  • 05 QA & ITPs
  • 06 Safety & SWMS
  • 07 Progress Claims
Client
SAGE Automation
Priya Nadan · priya@sageautomation.com.au
Tonsley SA · ABN 40 266 525 506
0438 774 220
Open customer →
Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.