Co-Create

26-1074 · Q-2026-1074

Dept for Infrastructure & Transport — Cable ladder support steel
Demo 05 Oct 2026
View project PRJ-2026-421 →
Job no
26-1074
Quote
Q-2026-1074
Client
Dept for Infrastructure & Transport
Estimator
Matthew Warren
Quote date
10 Jun 2026
Valid to
10 Jul 2026
Status
Won
Enquiry
Direct to quote
This quote is won. Item outcomes are recorded and the quote book is locked — won items are now on project PRJ-2026-421.
Item schedule Outcome recorded for each item
3 / 25 items
ItemDescription MaterialsLabourContract Hrs F / S / O SellContributionGP% Outcome
1 Bollards — cable ladder support steel $18,592 $27,168 $6,725 226 / 146 / 53 $75,014 $49,697 30% Won Open sheet →
2 Balustrade — cable ladder support steel $18,592 $26,988 $6,725 226 / 146 / 53 $74,798 $49,481 30.1% Won Open sheet →
3 Handrails — cable ladder support steel $18,592 $26,808 $6,725 226 / 146 / 53 $74,582 $49,265 30.1% Won Open sheet →
Quote total · ex GST $55,776 $80,964 $20,175 678 / 438 / 159 $224,395 $148,444 30.1%
Quote summary
Sell (ex GST)
$224,395.05
GST
$22,439.51
Total (inc GST)
$246,834.56
Materials$55,776.00
Labour$80,964.00
Contract services$20,175.00
Gross profit$67,480.05 30.1%
Contribution$148,444.05 66.2%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
678Factory
438Site
159Office
Won / lost position
Won$224,395.05
Lost$0.00
Pending$0.00
SharePoint folder
Created automatically
Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1074 Dept for Infrastructure & Transport — Cable ladder support steel
  • 01 Enquiry & Tender
  • 02 Quote Book 3 item sheets
  • 03 Drawings (SolidWorks)
  • 04 Purchasing
  • 05 QA & ITPs
  • 06 Safety & SWMS
  • 07 Progress Claims
Client
Dept for Infrastructure & Transport
Anthony Doidge · anthony@deptforinfrast.com.au
Walkerville SA · ABN 47 447 853 923
08 7109 7200
Open customer →
Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.