Co-Create

26-1082 · Q-2026-1082

Ahrens Group — Mezzanine & guarding — distribution centre
Demo 05 Oct 2026
Job no
26-1082
Quote
Q-2026-1082
Client
Ahrens Group
Estimator
Matthew Warren
Quote date
12 May 2026
Valid to
11 Jun 2026
Status
Lost
Enquiry
Direct to quote
Item schedule One sheet per item — open a sheet to cost it, then mark each item won, lost or pending
3 / 25 items
ItemDescription MaterialsLabourContract Hrs F / S / O SellContributionGP% Outcome
1 Handrails — mezzanine & guarding $16,050 $23,528 $5,796 196 / 127 / 46 $64,894 $43,048 30.1%
Open sheet →
2 Access platform — mezzanine & guarding $16,050 $23,528 $5,826 196 / 127 / 46 $64,928 $43,052 30.1%
Open sheet →
3 Stair & landings — mezzanine & guarding $16,050 $23,888 $5,826 196 / 127 / 46 $65,360 $43,484 30%
Open sheet →
Quote total · ex GST $48,150 $70,944 $17,448 588 / 381 / 138 $195,183 $129,585 30%
Each new item opens on its own sheet with a starter costing you can adjust.
Quote summary
Sell (ex GST)
$195,182.70
GST
$19,518.27
Total (inc GST)
$214,700.97
Materials$48,150.00
Labour$70,944.00
Contract services$17,448.00
Gross profit$58,640.70 30%
Contribution$129,584.70 66.4%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
588Factory
381Site
138Office
Won / lost position
Won$0.00
Lost$195,182.70
Pending$0.00
SharePoint folder
Created automatically
Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1082 Ahrens Group — Mezzanine & guarding — distribution centre
  • 01 Enquiry & Tender
  • 02 Quote Book 3 item sheets
  • 03 Drawings (SolidWorks)
  • 04 Purchasing
  • 05 QA & ITPs
  • 06 Safety & SWMS
  • 07 Progress Claims
Client
Ahrens Group
Stefan Ahrens · stefan@ahrensgroup.com.au
Sheaoak Log SA · ABN 79 710 227 931
0407 552 118
Open customer →
Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.