Job no
26-1072
Quote
Q-2026-1072
Client
Badge Constructions
Estimator
Tanya Fielke
Quote date
16 Jul 2026
Valid to
15 Aug 2026
Status
Lost
Enquiry
Direct to quote
Quote summary
Sell (ex GST)
$266,891.75
GST
$26,689.18
Total (inc GST)
$293,580.93
Materials$65,655.00
Labour$97,356.00
Contract services$23,828.00
Gross profit$80,052.75 30%
Contribution$177,408.75 66.5%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
800Factory
520Site
188Office
Won / lost position
Won$0.00
Lost$266,891.75
Pending$0.00
SharePoint folder
Created automatically Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1072 Badge Constructions — Ships ladders, cages & landings
- 01 Enquiry & Tender
- 02 Quote Book 4 item sheets
- 03 Drawings (SolidWorks)
- 04 Purchasing
- 05 QA & ITPs
- 06 Safety & SWMS
- 07 Progress Claims
Client
Badge Constructions
Nick Karagiannis · nick@badgeconstruct.com.au
Kent Town SA · ABN 43 817 483 579
0407 118 662
Open customer → Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.
Co-Create Solutions
37 Ellemsea Circuit · Lonsdale SA 5160
ABN 62 137 984 210 · (08) 7231 0699 · cocreate.net.au
QUOTE
Q-2026-1072 · Job 26-1072
Date 16 Jul 2026
Valid until 15 Aug 2026
Bill to
Badge Constructions
Nick Karagiannis
Kent Town SA
ABN 43 817 483 579
| Description | Qty | Unit (ex) | Amount (ex) |
|---|---|---|---|
| Item 1 — Stair & landings — ships ladders, cages & landings | 1 | $66,583.75 | $66,583.75 |
| Item 2 — Screens — ships ladders, cages & landings | 1 | $66,863.50 | $66,863.50 |
| Item 3 — Bollards — ships ladders, cages & landings | 1 | $66,644.75 | $66,644.75 |
| Item 4 — Balustrade — ships ladders, cages & landings | 1 | $66,799.75 | $66,799.75 |
| Subtotal (ex GST) | $266,891.75 |
| GST 10% | $26,689.18 |
| Total (inc GST) | $293,580.93 |
Prices exclude GST unless stated. Each item may be accepted individually. Lead times confirmed on award. Fabricated to AS/NZS 5131 & AS/NZS 1554.
Co-Create Solutions · Engineering & fabrication partner