Co-Create

26-1073 · Q-2026-1073

Century Engineering — Security fencing, gates & bollards
Demo 05 Oct 2026
Job no
26-1073
Quote
Q-2026-1073
Client
Century Engineering
Estimator
Matthew Warren
Quote date
07 Jul 2026
Valid to
06 Aug 2026
Status
Lost
Enquiry
Direct to quote
Item schedule One sheet per item — open a sheet to cost it, then mark each item won, lost or pending
3 / 25 items
ItemDescription MaterialsLabourContract Hrs F / S / O SellContributionGP% Outcome
1 Screens — security fencing, gates & bollards $12,416 $18,760 $4,513 152 / 98 / 36 $50,919 $33,990 29.9%
Open sheet →
2 Bollards — security fencing, gates & bollards $12,416 $18,760 $4,513 152 / 98 / 36 $50,919 $33,990 29.9%
Open sheet →
3 Balustrade — security fencing, gates & bollards $12,416 $18,580 $4,513 152 / 98 / 36 $50,703 $33,774 30%
Open sheet →
Quote total · ex GST $37,248 $56,100 $13,539 456 / 294 / 108 $152,540 $101,753 29.9%
Each new item opens on its own sheet with a starter costing you can adjust.
Quote summary
Sell (ex GST)
$152,540.25
GST
$15,254.03
Total (inc GST)
$167,794.28
Materials$37,248.00
Labour$56,100.00
Contract services$13,539.00
Gross profit$45,653.25 29.9%
Contribution$101,753.25 66.7%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
456Factory
294Site
108Office
Won / lost position
Won$0.00
Lost$152,540.25
Pending$0.00
SharePoint folder
Created automatically
Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1073 Century Engineering — Security fencing, gates & bollards
  • 01 Enquiry & Tender
  • 02 Quote Book 3 item sheets
  • 03 Drawings (SolidWorks)
  • 04 Purchasing
  • 05 QA & ITPs
  • 06 Safety & SWMS
  • 07 Progress Claims
Client
Century Engineering
Wayne Fletcher · wayne@centuryenginee.com.au
Wingfield SA · ABN 85 339 189 254
0408 220 552
Open customer →
Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.