Co-Create

26-1075 · Q-2026-1075

Dept for Infrastructure & Transport — Handrail package — hospital fitout
Demo 05 Oct 2026
View project PRJ-2026-422 →
Job no
26-1075
Quote
Q-2026-1075
Client
Dept for Infrastructure & Transport
Estimator
Matthew Warren
Quote date
16 Jun 2026
Valid to
16 Jul 2026
Status
Won
Enquiry
Direct to quote
This quote is won. Item outcomes are recorded and the quote book is locked — won items are now on project PRJ-2026-422.
Item schedule Outcome recorded for each item
3 / 25 items
ItemDescription MaterialsLabourContract Hrs F / S / O SellContributionGP% Outcome
1 Balustrade — handrail package $10,633 $16,120 $3,813 130 / 84 / 32 $43,639 $29,193 30% Won Open sheet →
2 Handrails — handrail package $10,633 $16,300 $3,813 130 / 84 / 32 $43,855 $29,409 29.9% Won Open sheet →
3 Access platform — handrail package $10,622 $16,120 $3,855 130 / 84 / 32 $43,673 $29,196 29.9% Won Open sheet →
Quote total · ex GST $31,888 $48,540 $11,481 390 / 252 / 96 $131,167 $87,798 29.9%
Quote summary
Sell (ex GST)
$131,166.95
GST
$13,116.70
Total (inc GST)
$144,283.65
Materials$31,888.00
Labour$48,540.00
Contract services$11,481.00
Gross profit$39,257.95 29.9%
Contribution$87,797.95 66.9%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
390Factory
252Site
96Office
Won / lost position
Won$131,166.95
Lost$0.00
Pending$0.00
SharePoint folder
Created automatically
Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1075 Dept for Infrastructure & Transport — Handrail package — hospital fitout
  • 01 Enquiry & Tender
  • 02 Quote Book 3 item sheets
  • 03 Drawings (SolidWorks)
  • 04 Purchasing
  • 05 QA & ITPs
  • 06 Safety & SWMS
  • 07 Progress Claims
Client
Dept for Infrastructure & Transport
Anthony Doidge · anthony@deptforinfrast.com.au
Walkerville SA · ABN 47 447 853 923
08 7109 7200
Open customer →
Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.