Quote summary
Sell (ex GST)
$218,671.80
GST
$21,867.18
Total (inc GST)
$240,538.98
Materials$53,956.00
Labour$79,244.00
Contract services$19,696.00
Gross profit$65,775.80 30.1%
Contribution$145,019.80 66.3%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
660Factory
428Site
156Office
Won / lost position
Won$218,671.80
Lost$0.00
Pending$0.00
SharePoint folder
Created automatically Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1059 Bianco Construction — Balustrade & handrail package — apartments
- 01 Enquiry & Tender
- 02 Quote Book 4 item sheets
- 03 Drawings (SolidWorks)
- 04 Purchasing
- 05 QA & ITPs
- 06 Safety & SWMS
- 07 Progress Claims
Client
Bianco Construction
Marco Bianco · marco@biancoconstruc.com.au
Wingfield SA · ABN 23 904 253 702
0418 220 774
Open customer → Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.
Co-Create Solutions
37 Ellemsea Circuit · Lonsdale SA 5160
ABN 62 137 984 210 · (08) 7231 0699 · cocreate.net.au
QUOTE
Q-2026-1059 · Job 26-1059
Date 06 Sep 2026
Valid until 06 Oct 2026
Bill to
Bianco Construction
Marco Bianco
Wingfield SA
ABN 23 904 253 702
| Description | Qty | Unit (ex) | Amount (ex) |
|---|---|---|---|
| Item 1 — Access platform — balustrade & handrail package | 1 | $54,358.75 | $54,358.75 |
| Item 2 — Stair & landings — balustrade & handrail package | 1 | $55,057.35 | $55,057.35 |
| Item 3 — Screens — balustrade & handrail package | 1 | $54,768.85 | $54,768.85 |
| Item 4 — Bollards — balustrade & handrail package | 1 | $54,486.85 | $54,486.85 |
| Subtotal (ex GST) | $218,671.80 |
| GST 10% | $21,867.18 |
| Total (inc GST) | $240,538.98 |
Prices exclude GST unless stated. Each item may be accepted individually. Lead times confirmed on award. Fabricated to AS/NZS 5131 & AS/NZS 1554.
Co-Create Solutions · Engineering & fabrication partner