Job no
26-1063
Quote
Q-2026-1063
Client
Badge Constructions
Estimator
Tanya Fielke
Quote date
14 Aug 2026
Valid to
13 Sep 2026
Status
Won
Enquiry
Direct to quote
Quote summary
Sell (ex GST)
$308,324.20
GST
$30,832.42
Total (inc GST)
$339,156.62
Materials$76,272.00
Labour$111,684.00
Contract services$27,652.00
Gross profit$92,716.20 30.1%
Contribution$204,400.20 66.3%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
932Factory
604Site
216Office
Won / lost position
Won$308,324.20
Lost$0.00
Pending$0.00
SharePoint folder
Created automatically Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1063 Badge Constructions — Marine handrail & ladder package
- 01 Enquiry & Tender
- 02 Quote Book 4 item sheets
- 03 Drawings (SolidWorks)
- 04 Purchasing
- 05 QA & ITPs
- 06 Safety & SWMS
- 07 Progress Claims
Client
Badge Constructions
Nick Karagiannis · nick@badgeconstruct.com.au
Kent Town SA · ABN 43 817 483 579
0407 118 662
Open customer → Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.
Co-Create Solutions
37 Ellemsea Circuit · Lonsdale SA 5160
ABN 62 137 984 210 · (08) 7231 0699 · cocreate.net.au
QUOTE
Q-2026-1063 · Job 26-1063
Date 14 Aug 2026
Valid until 13 Sep 2026
Bill to
Badge Constructions
Nick Karagiannis
Kent Town SA
ABN 43 817 483 579
| Description | Qty | Unit (ex) | Amount (ex) |
|---|---|---|---|
| Item 1 — Balustrade — marine handrail & ladder package | 1 | $77,135.05 | $77,135.05 |
| Item 2 — Handrails — marine handrail & ladder package | 1 | $77,135.05 | $77,135.05 |
| Item 3 — Access platform — marine handrail & ladder package | 1 | $76,703.05 | $76,703.05 |
| Item 4 — Stair & landings — marine handrail & ladder package | 1 | $77,351.05 | $77,351.05 |
| Subtotal (ex GST) | $308,324.20 |
| GST 10% | $30,832.42 |
| Total (inc GST) | $339,156.62 |
Prices exclude GST unless stated. Each item may be accepted individually. Lead times confirmed on award. Fabricated to AS/NZS 5131 & AS/NZS 1554.
Co-Create Solutions · Engineering & fabrication partner