Job no
26-1076
Quote
Q-2026-1076
Client
Mossop Construction + Interiors
Estimator
Tanya Fielke
Quote date
11 Jun 2026
Valid to
11 Jul 2026
Status
Won
Enquiry
Direct to quote
Quote summary
Sell (ex GST)
$339,985.75
GST
$33,998.58
Total (inc GST)
$373,984.33
Materials$85,096.00
Labour$121,888.00
Contract services$30,725.00
Gross profit$102,276.75 30.1%
Contribution$224,164.75 65.9%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
1,028Factory
668Site
236Office
Won / lost position
Won$339,985.75
Lost$0.00
Pending$0.00
SharePoint folder
Created automatically Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1076 Mossop Construction + Interiors — Loading dock steel & bollards
- 01 Enquiry & Tender
- 02 Quote Book 4 item sheets
- 03 Drawings (SolidWorks)
- 04 Purchasing
- 05 QA & ITPs
- 06 Safety & SWMS
- 07 Progress Claims
Client
Mossop Construction + Interiors
Sam Mossop · sam@mossopconstruc.com.au
Hindmarsh SA · ABN 97 910 650 465
0417 665 220
Progress claims lodged through PayApps
Open customer → Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.
Co-Create Solutions
37 Ellemsea Circuit · Lonsdale SA 5160
ABN 62 137 984 210 · (08) 7231 0699 · cocreate.net.au
QUOTE
Q-2026-1076 · Job 26-1076
Date 11 Jun 2026
Valid until 11 Jul 2026
Bill to
Mossop Construction + Interiors
Sam Mossop
Hindmarsh SA
ABN 97 910 650 465
| Description | Qty | Unit (ex) | Amount (ex) |
|---|---|---|---|
| Item 1 — Handrails — loading dock steel & bollards | 1 | $85,115.65 | $85,115.65 |
| Item 2 — Access platform — loading dock steel & bollards | 1 | $84,638.80 | $84,638.80 |
| Item 3 — Stair & landings — loading dock steel & bollards | 1 | $84,683.65 | $84,683.65 |
| Item 4 — Screens — loading dock steel & bollards | 1 | $85,547.65 | $85,547.65 |
| Subtotal (ex GST) | $339,985.75 |
| GST 10% | $33,998.58 |
| Total (inc GST) | $373,984.33 |
Prices exclude GST unless stated. Each item may be accepted individually. Lead times confirmed on award. Fabricated to AS/NZS 5131 & AS/NZS 1554.
Co-Create Solutions · Engineering & fabrication partner