Job no
26-1044
Quote
Q-2026-1044
Client
Sarah Constructions
Estimator
Tanya Fielke
Quote date
26 Aug 2026
Valid to
25 Sep 2026
Status
Won
Enquiry
Quote summary
Sell (ex GST)
$48,631.10
GST
$4,863.11
Total (inc GST)
$53,494.21
Materials$11,176.00
Labour$19,014.00
Contract services$4,044.00
Gross profit$14,397.10 29.6%
Contribution$33,411.10 68.7%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
137Factory
88Site
43Office
Won / lost position
Won$48,631.10
Lost$0.00
Pending$0.00
SharePoint folder
Created automatically Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1044 Sarah Constructions — Stainless handrail & grab-rail package — hospital
- 01 Enquiry & Tender
- 02 Quote Book 3 item sheets
- 03 Drawings (SolidWorks)
- 04 Purchasing
- 05 QA & ITPs
- 06 Safety & SWMS
- 07 Progress Claims
Client
Sarah Constructions
David Petrusma · david@sarahconstruct.com.au
Marleston SA · ABN 14 546 100 265
0428 903 551
Progress claims lodged through PayApps
Open customer → Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.
Co-Create Solutions
37 Ellemsea Circuit · Lonsdale SA 5160
ABN 62 137 984 210 · (08) 7231 0699 · cocreate.net.au
QUOTE
Q-2026-1044 · Job 26-1044
Date 26 Aug 2026
Valid until 25 Sep 2026
Bill to
Sarah Constructions
David Petrusma
Marleston SA
ABN 14 546 100 265
| Description | Qty | Unit (ex) | Amount (ex) |
|---|---|---|---|
| Item 1 — 316 stainless handrail to stairs — satin finish | 1 | $28,840.85 | $28,840.85 |
| Item 2 — Grab rails & wall-mounted rails (DDA) | 1 | $11,919.65 | $11,919.65 |
| Item 3 — Stainless mesh infill panels | 1 | $7,870.60 | $7,870.60 |
| Subtotal (ex GST) | $48,631.10 |
| GST 10% | $4,863.11 |
| Total (inc GST) | $53,494.21 |
Prices exclude GST unless stated. Each item may be accepted individually. Lead times confirmed on award. Fabricated to AS/NZS 5131 & AS/NZS 1554.
Co-Create Solutions · Engineering & fabrication partner