Job no
26-1080
Quote
Q-2026-1080
Client
Sarah Constructions
Estimator
Tanya Fielke
Quote date
05 May 2026
Valid to
04 Jun 2026
Status
Won
Enquiry
Direct to quote
Quote summary
Sell (ex GST)
$265,611.40
GST
$26,561.14
Total (inc GST)
$292,172.54
Materials$66,148.00
Labour$95,608.00
Contract services$23,912.00
Gross profit$79,943.40 30.1%
Contribution$175,551.40 66.1%
Money left in the business — excludes materials and contract services.
Allowed hours — carried into the project
804Factory
520Site
188Office
Won / lost position
Won$265,611.40
Lost$0.00
Pending$0.00
SharePoint folder
Created automatically Set up with the job number when the quote was opened, with the standard templates in place.
Co-Create › Projects › 26-1080 Sarah Constructions — Access platforms & walkways — WWTP
- 01 Enquiry & Tender
- 02 Quote Book 4 item sheets
- 03 Drawings (SolidWorks)
- 04 Purchasing
- 05 QA & ITPs
- 06 Safety & SWMS
- 07 Progress Claims
Client
Sarah Constructions
David Petrusma · david@sarahconstruct.com.au
Marleston SA · ABN 14 546 100 265
0428 903 551
Progress claims lodged through PayApps
Open customer → Client acceptance
The client can accept from a link — no login. Accepting wins the quote: the won items go to the project register, each fabricated item gets a job card with its ITP, and the claims are staged.
Co-Create Solutions
37 Ellemsea Circuit · Lonsdale SA 5160
ABN 62 137 984 210 · (08) 7231 0699 · cocreate.net.au
QUOTE
Q-2026-1080 · Job 26-1080
Date 05 May 2026
Valid until 04 Jun 2026
Bill to
Sarah Constructions
David Petrusma
Marleston SA
ABN 14 546 100 265
| Description | Qty | Unit (ex) | Amount (ex) |
|---|---|---|---|
| Item 1 — Bollards — access platforms & walkways | 1 | $66,303.10 | $66,303.10 |
| Item 2 — Balustrade — access platforms & walkways | 1 | $66,148.10 | $66,148.10 |
| Item 3 — Handrails — access platforms & walkways | 1 | $66,148.10 | $66,148.10 |
| Item 4 — Access platform — access platforms & walkways | 1 | $67,012.10 | $67,012.10 |
| Subtotal (ex GST) | $265,611.40 |
| GST 10% | $26,561.14 |
| Total (inc GST) | $292,172.54 |
Prices exclude GST unless stated. Each item may be accepted individually. Lead times confirmed on award. Fabricated to AS/NZS 5131 & AS/NZS 1554.
Co-Create Solutions · Engineering & fabrication partner